Production planning for small businesses
Start from capacity rather than from ambition. Calculate what your materials allow per product, subtract what accepted orders already consume, sequence the remaining work by deadline and margin, then derive purchasing from the gap between committed output and available stock. Re-run the sequence whenever stock or orders change.
A production plan is four decisions
What can we make, from the materials we hold. What must we make, from accepted orders and their dates. What should we make, from margin and shelf life. What must we buy, from the difference between the first two.
Small producers who write plans that skip the first decision end up with schedules that assume materials which are not there. Capacity first is the habit that makes the rest of the plan trustworthy.
Sequencing when materials are shared
Two products competing for the same butter cannot both be planned at maximum. Rank by deadline first, then by contribution per unit of the bottleneck material rather than by headline margin. A product with a lower margin that uses less of the constrained material can be the better use of it.
This is the small business version of throughput accounting, and it needs no software beyond a correct capacity figure and a calculator.
Purchasing belongs inside the plan
Derive purchase quantities from committed production rather than from the look of the shelf. Set reorder points for routine materials using average daily usage multiplied by supplier lead time plus a buffer, and let unusual orders trigger a specific shortage calculation.
The result is fewer emergency top ups, fewer part deliveries, and cash that stays in the business rather than in a sack of flour bought too early.
When the spreadsheet stops coping
Spreadsheets do this arithmetic perfectly well. What they do not do is stay current. Every accepted order needs a manual deduction, every delivery needs an entry, and every formula assumes the person editing it understands the model.
Makeable keeps the same model live: recipes, stock, orders and capacity in one place, recalculated as things move, with alerts before a material becomes binding.
Plan with numbers
Deepen it
Related hubs
Common questions
What is production planning?
Deciding what to produce, in what quantity and in what order, given the materials, time and equipment available and the orders already accepted.
How do I plan production based on inventory?
Convert inventory into per product capacity, deduct materials committed to accepted orders, and plan only within what remains. Purchases are then derived from the gap between planned output and remaining stock.
What is the simplest production planning software for a small business?
Something that models materials, recipes and orders and nothing else. Makeable is built to that scope; full MRP and ERP systems add scheduling and finance layers most small producers do not need.
Makeable does this calculation live from your own materials and recipes, every time an order comes in. Start free, no card needed.
Try Makeable free